BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//shift2bikes.org//NONSGML shiftcal v2.1//EN
METHOD:PUBLISH
X-WR-CALNAME:Shift Community Calendar
X-WR-CALDESC:Find fun bike events all year round.
X-WR-RELCALID:community@shift2bikes.org
BEGIN:VEVENT
UID:event-19317@shift2bikes.org
SUMMARY:SW too-little-too-late bike infrastructure tour
CONTACT:Eric Wilhelm
DESCRIPTION:As children watch patiently out the window for the chance to 
 ride a bike to school or the park\, and the skies fill with wildfire 
 smoke\, PBOT continues building streets for cars\, sometimes with a block 
 or two of bike lane for a treat.  Bikeway designs from 20 years ago are 
 being cast in concrete as the anticlimax of 30 years of advocacy\, to the 
 tune of $26M/mile... and about one mile per decade.\n\nWe'll look at the 
 terrain between Multnomah\, Burlingame\, Hillsdale\, and a few other 
 neighborhoods\, why Barbur Blvd is such a state-highway-dept-neglected 
 disaster\, some recently-completed obsolete bike infrastructure\, and the 
 secret trails and side streets we use to sneak through the gaps between 
 the car sewers.  This casual group ride will be an easy pace with several 
 stops to discuss and observe the transportation infrastructure and missing
  links of southwest bikeways along the SW corridor.\nride at 5:45\nEnds at
  beers if anything is open after 
 8\nhttps://shift2bikes.org/calendar/event-19317
LOCATION:Multnomah Arts Center\n7688 SW Capitol Hwy\nnorthwest corner of 
 the building
STATUS:CONFIRMED
DTSTART:20240820T003000Z
DTEND:20240820T030000Z
CREATED:20240524T121928Z
DTSTAMP:20240524T121928Z
SEQUENCE:3
URL:https://shift2bikes.org/calendar/event-19317
END:VEVENT
END:VCALENDAR
