BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//shift2bikes.org//NONSGML shiftcal v2.1//EN
METHOD:PUBLISH
X-WR-CALNAME:Shift Community Calendar
X-WR-CALDESC:Find fun bike events all year round.
X-WR-RELCALID:community@shift2bikes.org
BEGIN:VEVENT
UID:event-24042@shift2bikes.org
SUMMARY:SW Unfinished Bikeways
CONTACT:Eric Wilhelm
DESCRIPTION:As children watch patiently out the window for the chance to 
 ride a bike to school or the park\, and the state transportation funding 
 plan struggles to join the 21st century\, PBOT continues building streets 
 for cars\, sometimes with a block or two of bike lane for a treat.  
 Bikeway designs from 20 years ago are being cast in concrete as the 
 anticlimax of 30 years of advocacy\, to the tune of $26M/mile... and about
  one mile per decade.\n\nWe'll look at the terrain between Multnomah\, 
 Burlingame\, Hillsdale\, and a few other neighborhoods\, why Barbur Blvd 
 is such a state-highway-dept-neglected disaster\, some recently-completed 
 obsolete bike infrastructure\, and the secret trails and side streets we 
 use to sneak through the gaps between the car sewers.  This casual group 
 ride will be an easy pace with several stops to discuss and observe the 
 transportation infrastructure and missing links of southwest bikeways 
 along the SW corridor.\nride at 5:45\nEnds at beer if anything is open 
 after 8\nhttps://shift2bikes.org/calendar/event-24042
LOCATION:Multnomah Arts Center\n7688 SW Capitol Hwy\nnorthwest corner of 
 the building
STATUS:CONFIRMED
DTSTART:20260825T003000Z
DTEND:20260825T030000Z
CREATED:20250727T113018Z
DTSTAMP:20250727T113018Z
SEQUENCE:4
URL:https://shift2bikes.org/calendar/event-24042
END:VEVENT
END:VCALENDAR
